Crossing Over 2009 CD2 RERIP-DoN
2009-07-23 - extension: avi - parts: 2 - size: 700 MB
Crossing Over 2009 CD2 RERIP-DoN
Crossing.
Over.2009.CD2.RERIP-DoNE.Upload3r.WwW.DDL-IL.NeT.
avi Hosted on: megaupload.com
Crossing Over-Mjewels
2009-12-15 - extension: avi - size: 698 MB
Crossing Over-Mjewels
Hosted on: megaupload.com
Crossing Over 3
2009-11-08 - extension: avi - parts: 4 - size: 20 MB
Crossing Over 3
Hosted on: rapidshare.com
Video results for: crossing over aviMore results from video
2XU Guerilla Stunt Masters Cross Swanston St, Melbourne.AVI 2XU, Australias fastest growing high-performance athletic apparel brand is literally stopped peak (More) 2XU, Australias fastest growing high-performance athletic apparel brand is literally stopped peak hour traffic this month in Melbourne, on at the corners of Flinders Street and Swanston Street!
Eight stunning 2XU stunt-masters have been out & about helping direct pedestrian traffic safely across the busy intersection dressed in cheeky cross-belted hot pants and flamingo Body Compass hoodies from the athletic apparel brands Fitness collection.
This traffic-stopping stunt is one of the first in a series of fun attention-grabbing activities to be staged across the city over the coming weekends. (Less)
Sept16 2008 Speed Swing Accident--Wide.avi This is a frightening video of a passenger train striking a piece of Maintenance of Way or M/W (More) This is a frightening video of a passenger train striking a piece of Maintenance of Way or M/W equipment, specifically a speed-swing, after the train crew had been advised by the foreman in charge that "all men and equipment are in the clear". As professional railroaders, we deal with maintenance of way people everyday. This is one of those things that we hope never happens, and it should not have happened. The old saying, especially among railroad men, is that, if it can happen, it will. As a locomotive engineer, this clip from the locomotive on-board video camera scares me to death! Even when protocol is followed by the train crew, if it isn't followed by the foreman in charge of his workmen, disaster is the only inevitable result. This is a very sobering video. Note that once the train is dynamited (emergency brake application--the loud "whoosh" that you hear in the video, followed by a succession of "beeps" from the EOT receiver) it takes approximately a half mile to get the train stopped. I wasn't there, but I know that engineer was shaking uncontrollably from this experience--trust me.-------------
This video is from the in cab camera on the lead locomotive of the West Coast Express, a commuter train that runs from Mission to Vancouver every morning. This incident happened in the Maple Ridge area where construction workers are building a new bridge which crosses over the tracks.
In the video shortly after it begins you will see a rectangular red sign on the right side of the track. This is the beginning of a maintenance gang's limits that are protected by what we call a form "B". To proceed past the "Red Board" the train crew must call the Foreman in charge of the gang to clear the train through the limits of the gang's "form B" via radio.
The train crew knows in advance when they go on duty at their initial terminal the location, duration, and Foreman of all "form Bs" on the territory they will be moving their train over on that day. The Foreman of this gang has already cleared the train to proceed through his limits. He was supposed to contact all members of his gang and ensure that they are clear of the tracks prior to clearing the train to proceed.
That did not happen in this case.
Reason unknown. The engineer of the train is sounding his horn as he proceeds through the gang's limits, a normal procedure to warn workers that we are coming through.
As the train approaches the road crossing that is still fouled by the front end loader you will hear a loud blast of air on the video. This is the engineer "plugging" the train or applying the emergency brakes when he sees the loader on the track ahead. The train is traveling at about 60 mph. The loader operator is trying to get clear of the track, he does not have enough time. (Less)
Crossing Over 2009 iTALiAN LiMITED DVDRip XviD-Republic CD1
2009-10-05 - extension: avi - parts: 2 - size: 699 MB
Crossing Over 2009 iTALiAN LiMITED DVDRip XviD-Republic CD1
Hosted on: megaupload.com